Skip to content
1900

A Multi-objective Planning Tool for the Optimal Supply of Green Hydrogen for an Inustrial Port Area Decarbonisation

Abstract

This study addresses the challenge of decarbonizing highly energy-intensive Industrial Port Areas (IPA), focusing on emissions from various sources like ship traffic, warehouses, buildings, cargo handling equipment and hardto-abate industry, typically hosted in port areas. The analysis and proposal of technological solutions and their optimal integration in the context of IPA is a topic of growing scientific interest with considerable social and economic implications. Representing the main novelties of the work, this study introduces (i) the development of a novel IPA energy and green hydrogen hub located in a tropical region (Singapore); (ii) a multi-objective optimization approach to analyse, synthesize and optimize the design and operation of the hydrogen and energy hub, with the aim of supporting decision-making for decarbonization investments. A sensitivity analysis identifies key parameters affecting optimization results, indicating that for large hydrogen demands, imported ammonia economically outperforms other green hydrogen carriers. Conversely, local hydrogen production via electrolysis becomes economically viable when the capital cost of alkaline electrolyser drops by at least 30 %. Carbon tax influences the choice of green hydrogen, but its price variation mainly impacts system operation rather than design. Fuel cells and batteries are not considered economically feasible solutions in any scenario.

Funding source: D.P. and R.T. acknowledge the financial support from the project sHYpS (sustainable HYdrogen powered Shipping, Horizon Europe call Horizon-CL5-2021-D5-01).
Related subjects: Applications & Pathways
Countries: Italy ; Singapore
Loading

Article metrics loading...

/content/journal6064
2024-07-25
2024-12-21
/content/journal6064
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error