Skip to content
1900

The Effect of a Nuclear Baseload in a Zero-carbon Electricity System: An Analysis for the UK

Abstract

This paper explores the effect of having a nuclear baseload in a 100% carbon-free electricity system The study analyses numerous 8 scenarios based on different penetrations of conventional nuclear, wind and solar PV power, different levels of overgeneration 9 and different combinations between medium and long duration energy stores (hydrogen and compressed air, respectively) to 10 determine the configuration that achieves the lowest total cost of electricity (TCoE). 11 At their current cost, new baseload nuclear power plants are too expensive. Results indicate the TCoE is minimised when demand 12 is supplied entirely by renewables with no contribution from conventional nuclear. 13 However, small modular reactors may achieve costs of ~£60/MWh (1.5x current wind cost) in the future. With such costs, 14 supplying ~80% of the country’s electricity demand with nuclear power could minimise the TCoE. In this scenario, wind provides 15 the remaining 20% plus a small percentage of overgeneration (~2.5%). Hydrogen in underground caverns provides ~30.5 TWh (81 16 days) of long-duration energy storage while CAES systems provide 2.8 TWh (~8 days) of medium-duration storage. This 17 configuration achieves costs of ~65.8 £/MWh. Batteries (required for short duration imbalances) are not included in the figure. 18 The TCoE achieved will be higher once short duration storage is accounted for.

Funding source: The authors would like to thank the United Kingdom’s Engineering and Physical Sciences Research Council (EPSRC) for supporting 17 this work through the following research grants: ‘Generation Integrated Energy Storage – A Paradigm Shift’ (EP/P023320/1) and 18 ‘Sustainable, Affordable and Viable Compressed Air Energy Storage’ (EP/W027569/1).
Related subjects: Applications & Pathways
Countries: United Kingdom
Loading

Article metrics loading...

/content/journal4376
2023-01-06
2024-11-22
/content/journal4376
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error