A New Method to Quantify the Leakage Scenarios (Frequencies and Flowrates) on Hydrogen High Pressure Components

Abstract

This work is part of the MULTHYFUEL E.U. research program [1] aiming at enabling the implementation of hydrogen dispersers in refuelling stations. One important challenge is the severity of accidents due to a leakage of hydrogen from a dispenser in the forecourt. The work presented in this paper deals with the quantification of the leakage scenarios in terms of frequencies and severities. The risk analysis exercise, although performed by experts, showed very large discrepancies between the frequencies of leakages of the same categories and even between the consequences. A large part of the disagreement comes from the failure databases chosen as shown in the paper. The mismatch between the components on which the databases have been settled and the actual hydrogen components may be responsible for this situation. However, as it stands, limited confidence can be laid on the outcome of the risk analysis.
A new method is being developed to calculate the frequencies of the leakage and the flowrate based on an accurate description of each component and of each hazardous situation. For instance, the possibility for a fitting to become untight due to pressure cycling is modelled based on the contact mechanics. Human errors can also be introduced by describing the tasks. In addition of the description of the method, the application to a disperser is proposed with some comparison to experiments. One of the outcomes is that leakage cross sections can be much larger than expected.

Funding source: "This work has been achieved in the framework of a project which has received funding from the Fuel Cells and Hydrogen 2 Joint Undertaking under Grant Agreement ID: 101006794."
Related subjects: Safety
Countries: France
Loading

Article metrics loading...

/content/conference5893
2023-09-21
2024-12-22
/content/conference5893
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error